FBaseDynamicMeshSceneProxy::UpdatedReferencedMaterials

This needs to be called if the set of active materials changes, otherwise the check in FPrimitiveSceneProxy::VerifyUsedMaterial() will fail if an override material is set, if materials change, etc, etc